Concrete thresholds were poured using 10 mm rebar for reinforcement. Formwork was installed to achieve even and sturdy thresholds. The height was adjusted so that after tiling, the thresholds would be level with the floor inside the house.
Additionally, a foundation was poured for the fence "over the river," where rebar and formwork were also utilized. A laser level was used to ensure the required height, and tying wire secured all elements effectively. During the process, posts were set for the future gate, preparing the area for further fence installation work.